Sma AUTOMATIC SWITCH BOX M-20 Manuel d'utilisateur Page 37

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 64
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 36
SMA Solar Technology AG 5Electrical Connection
Installation Guide AS-BOX-M_L-IA-IEN110320 37
5.7 Connecting the Feed-in Meter
Connection terminals:
2. If a feed-in meter does not need to be connected to the Automatic Switch Box, bridge the
terminal strips "AS-X5/ PV Meter" and "AS-X1/ Load Meter“.
3. Insert the cable (see section 5.2).
4. Connect PE to terminal strip "AS-X5/ PV Meter". Take the labeling on the connection terminals
into account.
5. Connect N to terminal strip "AS-X5/ PV Meter". Take the labeling on the connection terminals
into account.
6. If you use the Automatic Switch Box M, connect L to terminal strip "L1" of the connection terminal
"AS-X5/ PV Meter".
7. If you use the Automatic Switch Box L, connect L1, L2 and L3 to the terminal strip
"AS-X5/ PV Meter". Take the labeling on the connection terminals into account.
Displayed graphic
As an example, only the Automatic Switch Box L will be graphically displayed in this section.
The labeling of the connection terminals as well as the procedure for connecting the
Automatic Switch Box M is identical.
1.
Destruction of the Automatic Switch Box due to missing back-up fuse.
To limit a possible short-circuit current from the power distribution grid and to protect the cables
in the Automatic Switch Box, a fuse between feed-in meter and the Automatic Switch Box is
necessary.
Install a line fuse between the Automatic Switch Box and the feed-in meter. Take the
nominal current, the short-circuit switching capacities and the maximum cut-off current into
account (see section 10”Technical Data”,page53).
Vue de la page 36
1 2 ... 32 33 34 35 36 37 38 39 40 41 42 ... 63 64

Commentaires sur ces manuels

Pas de commentaire